Beaconsfield Dam Safety Upgrade project
- Beaconsfield
The priority for the Beaconsfield Dam Safety Upgrade project is to protect properties and communities located downstream of the reservoir
The priority for the Beaconsfield Dam Safety Upgrade project is to protect properties and communities located downstream of the reservoir
We’re taking a holistic approach to reducing flood risk in Elster Creek Catchment, collaboratively implementing the Elster Creek Catchment Flood Management Plan 2019-24 with the cities of Bayside, Glen Eira, Kingston and Port Phillip.
We’re constructing a new stormwater drain and wetland in the Pioneer Bay area to improve flood protection, waterway health and stormwater issues. This continues our important work to provide flood protection to the community.
We’ll be undertaking works to rehabilitate a one-kilometre section of the Surrey Road Relief Main Drain in South Yarra, and upgrade the existing access manholes.